Civil Works Quality Control Online

Manage laboratory test records, mix designs, and client reports from one controlled system.

LabAutomation helps material testing laboratories enroll online, maintain project-wise test records, prepare standards-based calculations, and issue traceable reports for civil works clients.

Initial Modules 6+ Concrete, Marshall, Proctor, CBR, GSB, WMM
Report Flow Draft to Final Review, approval, locking, and traceability
Standards Layer IS / MoRTH Version-aware formulas and acceptance limits
Product tour

From requisition to controlled report in one workspace.

01

Register and control the lab

Verify laboratory identity, maintain lab profile headers, configure users, assign roles, and keep subscription access transparent.

02

Create requisitions

Capture client, contractor, project, item, chainage, sample, component, and assigned-test details before recording observations.

03

Record tests with calculators

Use focused modules for gradation, blending, concrete mix design, Marshall, Proctor, CBR, Atterberg, bitumen, cement, cube, and field density work.

04

Issue reports and letters

Prepare item-wise or grouped reports, print calculation record sheets, and forward multiple requisitions under a single office letter.

Supported workflows

Focused modules for civil engineering laboratory tests.

LabAutomation supports concrete mix design, Marshall mix design, bituminous job mix formula, aggregate blending, sub-base testing, field density records, and material test reports used by civil works quality control laboratories.

Concrete mix design Marshall mix design Bituminous job mix formula Aggregate gradation and blending Proctor compaction CBR test records Atterberg limits Field density by sand replacement Cement test records Cube and specimen strength Fine aggregate zoning NABL-style report references
What laboratories get

Built around daily testing work, not generic data entry.

Client and project records

Maintain clients, work orders, packages, samples, and test requests in a structured online register.

Standards-based calculations

Prepare concrete mix designs, gradations, Marshall proportions, Proctor and CBR calculations with controlled formula versions.

Reusable gradation templates

Create aggregate gradation templates and blending utilities for GSB, WMM, and bituminous mix proportioning workflows.

Review-ready reports

Move records from draft to reviewed and final states, preserving calculation inputs, acceptance limits, and revision history.

Enrollment workflow

How a laboratory starts

1 Submit laboratory identity, address, NABL status, and administrator contact details.
2 Platform administrator reviews the application and verifies the submitted information.
3 After approval, the laboratory account and first branch are activated for online records.